Friday, April 15, 2011

The Workshop

Testing, dismantling and refurbishing operations are carried out in the workshop. This area must be organized in order to optimise the efficiency of these operations. The workshop must include several test beds and dismantling stations. As assembly-line work is not efficient for manual dismantling operations, each workstation should function independently.

In some cases, it would allow the most efficient operators not to be slowed down by less experienced employees. The workstation must also be arranged so that a trolley can move around in the workshop to bring equipment and pick up components and material resulting from the dismantling operation.

Labels: